Get every ship its Hong Kong Convention certificate, without starting the IHM again.
The Hong Kong Convention has been in force since 26 June 2025. Most ships with a maintained EU SRR inventory are already close. We check what is missing, close it and support you up to the certificate, and at the end of the ship's life, through recycling.
- 26 Jun 2030ICIHM deadline for existing ships
- 250+ships served
- 22countries sampled
What we do for HKC compliance
For existing ships, new buildings and ships heading for recycling.
Gap check of your current IHM
We compare your IHM Part I with the HKC and the 2023 IMO guidelines, and list exactly what needs to change.
Additional sampling where needed
If items were never checked or sampled, our surveyors close the gaps on board.
Certificate survey support
We prepare the IHM for class and support the survey for the International Certificate on IHM, usually alongside the class renewal.
Maintenance through the ship's life
Part I has to stay current after certification. ISeaLog keeps it updated from your purchases every month.
IHM Part II and III before recycling
When a ship is sold for recycling, we prepare the operationally generated waste and stores parts of the inventory.
Final survey support
We prepare the documents the flag or class needs for the final survey and the International Ready for Recycling Certificate.
Our route to the certificate
Check
We review your existing IHM and certificates.
Close
Missing items are surveyed, sampled and added.
Certify
The IHM goes to class for the ICIHM survey.
Maintain
ISeaLog keeps Part I current until the ship's last voyage.
What the Convention requires
The Hong Kong International Convention for the Safe and Environmentally Sound Recycling of Ships entered into force on 26 June 2025.
Existing ships of 500 GT and above engaged in international voyages must hold an International Certificate on Inventory of Hazardous Materials by 26 June 2030 at the latest. Unless the flag says otherwise, the initial survey is usually harmonised with the renewal of other statutory certificates.
Before recycling, a ship must pass a final survey covering IHM Parts I, II and III and the ship recycling plan, and receive an International Ready for Recycling Certificate.
Common questions
We already have an EU SRR certificate. Is that enough?
Not on its own, but it is a strong start. A properly maintained EU SRR inventory can usually be the basis for the HKC certificate after a gap check.
When should we do it?
Most owners plan it with the next class renewal survey before 26 June 2030. Ships going for recycling need it sooner.
Does the IHM need maintaining after certification?
Yes. Part I must be kept up to date for the life of the ship, which is what our IHM maintenance service on ISeaLog does.
Can you help when we sell a ship for recycling?
Yes. We prepare IHM Parts II and III and the documents for the final survey and the Ready for Recycling Certificate.
How is this priced?
A gap check is quoted per ship, with fleet pricing. Send us your fleet list and the current IHM status.
Ready when your ship is.
Send us the ship type, IMO and port. We reply within one working day with scope, timing and price.
